Railway Concrete Bridges

Project and design or artworks for the total railway infrastructure renovation, section Emp. Bancalari – Empalme Alvear to section G. Castro (Pr. 189,785) – Ramallo (Pr. 215,165), line Buenos Aires – Rosario, including:
– Design and detailed engineering of three rail bridges with spans between 8.00 m and 12.00 m.
– Detail drawings of rail tracks for both bridge entrances.

Client: Milicic S.A. Civil Constructions

Other Projects for Milicic S.A.:

Detail Engineering for Effluent Treatment Plant Construction
Technical documents writing (reinforcing sheets and details) for the execution of civil works in the trenches area, storage area and homogenization rafts area and equipment.
Vuelta Obligado Thermoelectric Power Plant – Timbúes – Province of Santa Fe.

Pipe Support Structure in Dock
Design and detail engineering of steel structure for pipe support consisting of five sections of bridge beams and support cantilevers.
Vuelta Obligado Thermoelectric Power Plant – Timbúes – Province of Santa Fe.

Urbanization Infrastructure
– Detailed engineering for construction of sewers and reservoir of flows in future urbanization zone.
Locality of Gral. Lagos – Santa Fe – Argentina